Me
Connectivity Engineer - Data Center Construction | Ingénieur en connectivité - Construction de centres de données
Meta
Full-time
Vancouver, Canada
other-general
Posted:
June 01, 2026
Location:
Vancouver, Canada, Canada
Job Description
**Summary:**
Meta is seeking a Connectivity Engineer to join the Design Engineering and Construction (DEC) team. Our data centers are the foundation upon which our services are delivered, and our rapidly scaling infrastructure operates. The team lights up Meta ’s global data centers, delivering the physical infrastructure that connects the world to the videos, feeds, and other information stored on Meta ’s server banks.The DEC Connectivity Engineer will provide site level support to ensure DEC telecommunication projects are being executed on schedule, within budget and at the level of quality specified. Connectivity Engineer will be the key point of contact for managing the full project life-cycle including project kick-off all the way through production turnover into operations. DEC Connectivity Engineer is highly collaborative with cross-functional partners at the Data Center Headquarters, our on-site contractor, and other data centers globally.-------Meta recherche un ingénieur...
Meta is seeking a Connectivity Engineer to join the Design Engineering and Construction (DEC) team. Our data centers are the foundation upon which our services are delivered, and our rapidly scaling infrastructure operates. The team lights up Meta ’s global data centers, delivering the physical infrastructure that connects the world to the videos, feeds, and other information stored on Meta ’s server banks.The DEC Connectivity Engineer will provide site level support to ensure DEC telecommunication projects are being executed on schedule, within budget and at the level of quality specified. Connectivity Engineer will be the key point of contact for managing the full project life-cycle including project kick-off all the way through production turnover into operations. DEC Connectivity Engineer is highly collaborative with cross-functional partners at the Data Center Headquarters, our on-site contractor, and other data centers globally.-------Meta recherche un ingénieur...
Apply for this Job
Submit your application for the Connectivity Engineer - Data Center Construction | Ingénieur en connectivité - Construction de centres de données position at Meta.
Apply Now Save for LaterJob Overview
Job Type:
Full-time
Location:
Vancouver, Canada
Posted:
June 01, 2026
Deadline:
June 06, 2026