Go
Electrical Engineer, Data Center Construction and Design
Google
Full-time
Sweden, Sweden
other-general
Posted:
June 13, 2026
Location:
Sweden, Sweden, Sweden
Job Description
Electrical Engineer, Data Center Construction and Design
_corporate_fare_ Google _place_ Stockholm, Sweden; Sweden _laptop_windows_ Remote eligible
**Mid**
Experience driving progress, solving problems, and mentoring more junior team members; deeper expertise and applied knowledge within relevant area.
_info_outline_
XNote: Google's hybrid workplace includes remote and in-office roles. By applying to this position you will have an opportunity to share your preferred working location from the following:
**In-office locations: Stockholm, Sweden.**
**Remote location(s): Sweden.**
**Minimum qualifications:**
+ Bachelor's degree in Electrical, Mechanical, Industrial, or Construction Engineering or equivalent practical experience.
+ 3 years of experience in design development of electrical power distribution and data center infrastructure products.
+ 3 years of experience with Electrical Engineering for construc...
_corporate_fare_ Google _place_ Stockholm, Sweden; Sweden _laptop_windows_ Remote eligible
**Mid**
Experience driving progress, solving problems, and mentoring more junior team members; deeper expertise and applied knowledge within relevant area.
_info_outline_
XNote: Google's hybrid workplace includes remote and in-office roles. By applying to this position you will have an opportunity to share your preferred working location from the following:
**In-office locations: Stockholm, Sweden.**
**Remote location(s): Sweden.**
**Minimum qualifications:**
+ Bachelor's degree in Electrical, Mechanical, Industrial, or Construction Engineering or equivalent practical experience.
+ 3 years of experience in design development of electrical power distribution and data center infrastructure products.
+ 3 years of experience with Electrical Engineering for construc...
Apply for this Job
Submit your application for the Electrical Engineer, Data Center Construction and Design position at Google.
Apply Now Save for LaterJob Overview
Job Type:
Full-time
Location:
Sweden, Sweden
Posted:
June 13, 2026
Deadline:
June 18, 2026