Ja
Environmental & Permits Manager F/H
Janin Atlas
Contrat à durée indéterminée
Pickering, Ontario
Physical Scientists
Posted:
February 28, 2026
Location:
Pickering, Ontario, Canada
Job Description
What is the project?
The Pickering Nuclear Generating Station refurbishment program involves designing and building a new deep-water intake in Lake Ontario to improve the plant's cooling system. This will involve:
- A 1.5 km-long tunnel, built by a pressurized TBM (10.15 m diameter slurry TBM);
- Two vertical shafts (onshore and offshore);
- An offshore modular intake structure, resting on the lake bed.
The project is distinguished by its proximity to an active nuclear site, requiring rigorous standards of safety, planning and coordination.
Concretely, your tasks will be:
Environment
Apply for this Job
Submit your application for the Environmental & Permits Manager F/H position at Janin Atlas.
Apply Now Save for LaterJob Overview
Job Type:
Contrat à durée indéterminée
Location:
Pickering, Canada
Posted:
February 28, 2026
Deadline:
April 09, 2026