Proj Mngr Electrical CPP

Aditya Birla Group
Full-time Bargawan, Madhya Pradesh Engineers
Posted:
June 23, 2026
Location:
Bargawan, Madhya Pradesh, India

Job Description

The position is not evaluated; hence the tentative JB is 8

Job / Activity / KRA

The role focuses on the implementation of state-of-the-art technologies to optimize power distribution, load balancing, and control system integration while ensuring safety, reliability, and cost efficiency.

 This position also oversees the alignment of the thermal plant with a 300 MW renewable energy integration, addressing electrical challenges like grid outages, fluctuating loads, and ensuring operational continuity for the smelter.

Job Brief

Conduct a detailed feasibility study of E&I systems to integrate renewable energy, thermal power, and smelter load requirements.Assess technical and financial viability, ensuring operational reliability and cost-effectiveness.Lead electrical system design, including power distribution, substation layout, and control schemes.Review and refine instrumentation designs, ensuring system integration with Distribute...

Apply for this Job

Submit your application for the Proj Mngr Electrical CPP position at Aditya Birla Group.

Apply Now Save for Later

Job Overview

Job Type: Full-time
Location: Bargawan, India
Posted: June 23, 2026
Deadline: August 02, 2026