Hi
Site Engineer - Rail System Integration
Hill International
Full-time
mumbai, maharashtra
Other-General
Posted:
June 10, 2026
Location:
mumbai, maharashtra, India
Job Description
Mumbai Metro Line 4 and 4A are part of the city’s expanding rapid transit network being developed by the Mumbai Metropolitan Region Development Authority (MMRDA). Line 4 is a major 32.3 km elevated metro corridor running from Wadala to Kasarvadavali in Thane, with around 30 stations and extensive connectivity across the eastern suburbs. This role focuses on ensuring effective interface management between civil, track, E&M, and system contractors to achieve a safe, reliable, and fully integrated transport system.
Apply for this Job
Submit your application for the Site Engineer - Rail System Integration position at Hill International.
Apply Now Save for LaterJob Overview
Job Type:
Full-time
Location:
mumbai, India
Posted:
June 10, 2026
Deadline:
July 20, 2026