Am
Transmission Right of Way Agent-Associate
American Electric Power
Full-time
Abilene, TX
other-general
Posted:
June 17, 2026
Location:
Abilene, TX, United States
Job Description
**Job Posting End Date**
06-25-2026
Please note the job posting will close on the day before the posting end date.
**Job Summary**
The Transmission Right of Way (TROW) Agent is responsible for the acquisition of land rights necessary for the construction, operation and maintenance of electric transmission and/or distribution facilities.
**Job Description**
**What you’ll do:**
+ Handle complicated negotiations with landowners (or their designees) for the acquisition of land rights relative to the construction, reconstruction, or maintenance of electric transmission and/or distribution facilities.
+ Settle damage claims with property owners (or their designees) relative to property damage caused or created by AEP, or its contractors, during the construction, reconstruction, maintenance or removal of transmission and/or distribution facilities. Search courthouses and other records as may be available to determine present property...
06-25-2026
Please note the job posting will close on the day before the posting end date.
**Job Summary**
The Transmission Right of Way (TROW) Agent is responsible for the acquisition of land rights necessary for the construction, operation and maintenance of electric transmission and/or distribution facilities.
**Job Description**
**What you’ll do:**
+ Handle complicated negotiations with landowners (or their designees) for the acquisition of land rights relative to the construction, reconstruction, or maintenance of electric transmission and/or distribution facilities.
+ Settle damage claims with property owners (or their designees) relative to property damage caused or created by AEP, or its contractors, during the construction, reconstruction, maintenance or removal of transmission and/or distribution facilities. Search courthouses and other records as may be available to determine present property...
Apply for this Job
Submit your application for the Transmission Right of Way Agent-Associate position at American Electric Power.
Apply Now Save for LaterJob Overview
Job Type:
Full-time
Location:
Abilene, United States
Posted:
June 17, 2026
Deadline:
June 22, 2026